Archive

  • Customer: Pfizer

  • Our Role: Design-Build

  • Size: 271,080 SF

  • Construction Schedule: 7 Months (Phase 1), 5 Months (Phase 2)

  • Location: Reno, NV

Project Description

Phase I of this project was for a build-to-suit, 167,900 square-foot pharmaceutical grade warehouse and distribution facility. Phase II added 103,180 square-feet to the initial facility 4 years later. The entire facility was constructed to FDA and cGMP pharmaceutical standards, included fully air-conditioned space with internal freezer, cooler, aerosol, flammable and DEA spaces.

  • Customer: Sage Ridge School

  • Our Role: Design-Build

  • Size: 30,620 SF

  • Location: Reno, NV

Project Description

This multi-phased project included the construction of a new private middle school and campus expansion to accommodate a high school two years later. The middle school portion consisted of classrooms, library, administrative offices and gymnasium. The high school portion added a new 14,400 square-foot class room building, 2,500 square-foot locker room addition and front entry modifications of existing school building, site improvements, sheet extension and soccer field.

  • Customer: Washoe County School District

  • Our Role: General Contractor

  • Size: 123,000 SF

  • Location: Sparks, NV

Project Description

This project included the construction of a new 123,000 square-foot middle school for the Washoe County School District. Features included a cafeteria, gymnasium, site improvements, library and athletic field.

  • Customer: Washoe County School District

  • Our Role: General Contractor

  • Size: 56,000 SF

  • Location: Sparks, NV

Project Description

This project included the construction of a new 56,000 square-foot elementary school for the Washoe County School District. Features included a cafeteria, gymnasium, site improvements and outdoor recreation area.

  • Customer: Washoe County High School

  • Our Role: General Contractor

  • Size: 200,000 SF

  • Location: Reno, NV

Project Description

This project included the construction of a new 200,000 SF Comprehensive High School for the Washoe County School District featuring a gymnasium, auditorium, and athletics fields for baseball and football with a running track.