Archive

  • Customer: Crow Holdings Industrial

  • Our Role: General Contractor

  • Size: 90,500 SF

  • Construction Schedule: 7 Months

  • Location: Livermore, CA

Project Description

Crow Holdings Industrial hired United Construction as their General Contractor for the construction of a new speculative industrial facility in Livermore, California. This tilt-up concrete building includes a 90,500-square-foot distribution space with overhead dock doors, multiple office entries and parking, all sitting on nearly five acres of land.

  • Customer: Doral Academy of Northern Nevada

  • Our Role: General Contractor

  • Size: 54,685 SF

  • Construction Schedule: 9 Months

  • Location: Reno, NV

Project Description

The bottom of Mount Rose Scenic Highway now features a new public charter school: Doral Academy of Northern Nevada. Designed and built to blend in with the surrounding mountainous landscape, Doral Academy’s new campus features a three-story, 54,685 square-foot facility.

 

The building has classrooms, specialty laboratories, an art studio, music and dance studios and indoor and outdoor areas for recreation. It was built to serve more than 600 kids in grades K-8.

 

As the General Contractor, United Construction collaborated closely with Doral Academy, Boyer (Owner’s Representative), and Ethos Three Architects in order to phase and expedite the project schedule so that the school could open in time for the start of the 2018 school year.

  • Customer: Sofidel America Corp.

  • Our Role: Design-Build

  • Size: 546,480 SF

  • Location: North Las Vegas, NV

Project Description

Located within the LogistiCenter at Las Vegas Blvd industrial park, the renovated Sofidel facility includes a tenant improvement buildout, new offices and crane bays. United Construction was the design-build contractor for the remodeling and spent extra time on TI to crane bays 5 and 6 and crane line 6/7.

  • Customer: LDK Ventures

  • Our Role: General Contractor

  • Size: 707,596 SF

  • Location: Richmond, CA

Project Description

This project included the construction of a new concrete, tilt-up warehouse building. Site improvements include 340 automobile parking stalls, truck trailer parking stalls, site paving, lighting, drainage, fencing and landscaping. The building is a 707,596 square-foot high cube warehouse/distribution center with a 36’ clear height and 158 dock high positions and 4 drive-in doors, designed by Ware Malcomb Architects. The building was designed as a speculative warehouse with Fire Safety controlled by a design-build ESFR system with fire pump. Water, sewer, gas and electric services will be stubbed into the building at multiple points to allow flexibility for future interior improvements.

  • Customer: Charles Schwab

  • Our Role: General Contractor

  • Size: 20,259 SF

  • Construction Schedule: 8 Months

  • Location: Reno, NV

Project Description

As the first building to be constructed in the new Rancharrah community, 5301 Kietzke has set the bar high for buildings to come. The two-story, 20,259 square-foot building features floor to ceiling windows that frame incredible views expanding from the mountains to downtown. With positioning along a major thoroughfare, the glow of modern LED fixtures illuminating through the building’s iconic glass design is enjoyed by thousands daily.

 

5301 Kietzke was designed to be as efficient as it is stunning. Floor-to-ceiling glass walls provide a modern aesthetic, breathtaking views and energizing amounts of sunlight for guests and employees to enjoy throughout the workday. The unique floor plan was designed to leverage the daylight for maximized lighting efficiency and enjoyment. Complimenting the natural daylight and picturesque views are modern LED light fixtures that double as artistic design enhancements. Lighting and door controls are digitally programmed and managed online for ultimate of use and sustainability.

 

Together, innovative building design and wise material selection create the ultimate window system that regulates temperature, glare from the sun and noise reduction. The Charles Schwab Office was designed with 4-foot by 4-inch vents along the floor-to-ceiling glass walls. The vents ensure consistent temperature control year-round. Additionally, upgraded MechoShade systems are in sync with the sun and direct the window treatments to lower and raise automatically, or at the push of a button.

  • Customer: Exeter Property Group

  • Our Role: General Contractor

  • Size: 565,580 SF

  • Construction Schedule: 5 Months

  • Location: Manteca, CA

Project Description

This Build-to-Suit project for Exeter Property Group included the construction of a 565,000 square-foot shell and build-out for Medline.

  • Customer: Prologis

  • Our Role: General Contractor

  • Size: 644,160 SF

  • Construction Schedule: 12 Months

  • Location: Tracy, CA

Project Description

This Build-to-Suit project for Prologis included the construction of a 644,160 square-foot distribution center with a 19,408 square-foot office.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 128,524 SF

  • Location: Hayward, CA

Project Description

This project included major upgrades to an existing 128,524 square-foot distribution and manufacturing facility in Hayward, CA. Improvements included new interior and exterior paint, new roof, new rooftop HVAC units, new skylights, new roll up doors, ADA upgrades and electrical upgrades. As the Design-Build contractor, United Construction managed the project from our northern California office.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 622,959 SF

  • Construction Schedule: 14 Months

  • Location: Lathrop, CA

Project Description

This project included the construction of a new 622,959 industrial facility for Dermody Properties in Lathrop, CA. During the course of construction, Pratt Industries, a leading box manufacturer, leased the entire building. United Construction worked closely with Dermody, Pratt Industries and Ware Malcomb Architects to perform the tenant improvements as well.

  • Customer: Walton’s Funeral Home

  • Our Role: Design-Build

  • Size: 5,650 SF

  • Construction Schedule: 5 Months

  • Location: McCarran, NV

Project Description

This project included the rebuild of a 5,650 square-foot funeral home after the original facility had burned down. The new space features private meeting rooms, and events center with prep kitchen.