Archive

  • Customer: LUX Dynamics

  • Our Role: Design-Build

  • Size: 51,050 SF

  • Location: Reno, NV

Project Description

The new assembly building for LUX Dynamics, a Reno-based manufacturer of high bay lighting fixtures, is a 51,050-square-foot facility on Corporate Blvd. As the Design-Build contractor, United Construction provided in-house architectural design and construction management for the new tilt-up facility. Features of the building include 28’ clear-height ceilings and a 5,724 square-foot mezzanine that offers flexible expansion options. With completion of the new facility, LUX has capacity to expand their team to upwards of 100 employees.

  • Customer: Berkley International

  • Our Role: Design-Build

  • Size: 80,000 SF

  • Location: McCarran, NV

Project Description

The new manufacturing plant for Berkley International, a molded fiber and sustainable packaging provider headquartered in Southern California, is an 80,000-square-foot facility at the Tahoe Reno Industrial Center (TRIC). United Construction’s internal team provided architectural design for the project to design a space that accommodated Berkley’s current needs within a young company’s tight budget, and had expansion flexibility to support their growing success.

 

United Construction worked closely with Berkley International, their equipment suppliers in South Africa, and local building partners to complete the project with zero safety accidents, on-time and under budget.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 389,672 SF

  • Location: Pleasanton, CA

Project Description

This distribution warehouse, located at 4225 Hacienda Drive in Pleasanton, is situated on more than 22 acres of parcel space and includes 28-30′ interior clear height, 45 dock doors, and four grade-level doors. Along with the excess land for future expansions, this facility is tailor-made for logistics companies.

  • Customer: Carson City School District

  • Our Role: Design-Assist/CMAR

  • Size: 59,120 SF

  • Location: Carson City, NV

Project Description

The Fremont Elementary School Expansion project consisted of construction of approximately 14,000 sf expansion and tenant improvements of the campus. Construction and selective demolition provided space for enrollment growth and to improve space for Kindergarten, General Education, Special Education, and Early Childhood Development, along with miscellaneous tenant improvements.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 655,976 SF

  • Location: Stockton, CA

Project Description

Located in the Stockton Commerce Center, the Army Court Distribution Center is a concrete tilt, make ready project that transformed a former Toys R Us distribution center into a leasable warehouse space and a 16,000 sf office renovated to suit. The lot sits on more than 36 acres and is divisible by 148,000 sf to fit industrial company space needs.

  • Customer: Scannell Properties

  • Our Role: Hard Bid

  • Size: 560,820 SF

  • Location: Mustang, NV

Project Description

Scannell Mustang #564 is a new 560,820-square-foot speculative industrial building in Mustang, Nevada. United Construction was the design-build contractor for this new 36′ clear double-loaded distribution facility, which is owned by Scannell Properties. Features include 54′ x 50′ columns, 60′ speed bays and 7″ reinforced floors.

  • Customer: Sierra Nevada Construction (SNC)

  • Our Role: Hard Bid

  • Size: 1,352 SF

  • Location: Sparks, NV

Project Description

This tenant improvement project, built by United Construction in partnership with their subcontractors, involved renovation to SNC’s office on East Prater Way in Sparks. The remodel includes new doors and frames, tile flooring, concrete floor slabs, custom millwork, insulation and sealants, framing, drywall and more.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 655,680 SF

  • Location: North Las Vegas, NV

Project Description

LogistCenter at Las Vegas Boulevard is a two-building industrial park totaling 655,680 square-feet featuring 32′ warehouse clear height, 6″ reinforced slab, 18 dock positions and 3 grade level doors, ESFR, 135′ truck court with 60′ concrete apron, 1200 amps 277/480 V power and 111 auto parking spaces. United Construction completed the build-out of building 1 (546,480 SF) for Sofidel, a manufacturer of tissue paper for sanitary and domestic use.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 1.6 Million SF

  • Location: Reno, NV

Project Description

LogistiCenter at 395 Phase 2 is a 130-acre industrial park that will be home to more than 1.6 million square feet of industrial space. Construction is complete on Buildings 1 and 2. As the Design-Build Contractor, United Construction provided in-house design, and managed all construction related activity for the site, shell and tenant improvements.

  • Customer: Bedrosians Tile & Stone

  • Our Role: General Contractor

  • Size: 51,000 SF

  • Location: Reno, NV

Project Description

The new 53,000 sf facility features a state-of-the-art showroom, 22,095-square-foot warehouse with a five-ton overhead crane spanning 70 feet. As the General Contractor for this project, our work ensured that there was plenty of room for future expansion.