Archive

  • Customer: Washoe County School District

  • Our Role: General Contractor

  • Size: 150,000 SF

  • Location: Sparks, NV

Project Description

This project included the construction of a new middle school for the Washoe County School District. This building is an energy star design underground geothermal exchange heating & cooling with electrical motorized skylight gathering capabilities, using 30% less energy than other similar size schools.

  • Customer: Truckee Meadows Community College

  • Our Role: General Contractor

  • Size: 48,000 SF Expansion, 60,000 SF Renovation

  • Location: Reno, NV

Project Description

All work was done with the confines of an operating community college. This project consisted of 40,000 SF of new construction, 60,000 SF of remodel to the existing Red Mountain Building as well as new construction of an 8,000 SF metal building to relocate the campus Plant Facility Department. These facilities are the focal point of the community college and demanded close collaboration between the Owners, Architects, United Construction as well as all subcontractors. The remodel included interior demolition of existing maintenance facility, auditorium, kitchen classrooms, science labs, fitness center and various other offices and classrooms.

 

The remodel portion of the project included the revamping of the facilities fire and life protection system. There was also extensive sitework regrading, custom concrete work and landscaping.

  • Customer: RPL Group

  • Our Role: Design-Assist

  • Size: 65,050 SF

  • Location: Reno, NV

Project Description

This project consisted of building three commercial-use structures, including a 53,250 square-foot, three-story, class “A” office building with underground parking, a 9,000 square-foot retail center and a 2,800 square-foot restaurant. The office building’s exterior features third-floor balconies as well as trellised patios and a sculpted storefront entry. An underground parking garage includes a convenient tunnel which accesses the restaurant.

  • Customer: Pfizer

  • Our Role: Design-Build

  • Size: 271,080 SF

  • Construction Schedule: 7 Months (Phase 1), 5 Months (Phase 2)

  • Location: Reno, NV

Project Description

Phase I of this project was for a build-to-suit, 167,900 square-foot pharmaceutical grade warehouse and distribution facility. Phase II added 103,180 square-feet to the initial facility 4 years later. The entire facility was constructed to FDA and cGMP pharmaceutical standards, included fully air-conditioned space with internal freezer, cooler, aerosol, flammable and DEA spaces.

  • Customer: Sage Ridge School

  • Our Role: Design-Build

  • Size: 30,620 SF

  • Location: Reno, NV

Project Description

This multi-phased project included the construction of a new private middle school and campus expansion to accommodate a high school two years later. The middle school portion consisted of classrooms, library, administrative offices and gymnasium. The high school portion added a new 14,400 square-foot class room building, 2,500 square-foot locker room addition and front entry modifications of existing school building, site improvements, sheet extension and soccer field.

  • Customer: Washoe County School District

  • Our Role: General Contractor

  • Size: 123,000 SF

  • Location: Sparks, NV

Project Description

This project included the construction of a new 123,000 square-foot middle school for the Washoe County School District. Features included a cafeteria, gymnasium, site improvements, library and athletic field.

  • Customer: Washoe County School District

  • Our Role: General Contractor

  • Size: 56,000 SF

  • Location: Sparks, NV

Project Description

This project included the construction of a new 56,000 square-foot elementary school for the Washoe County School District. Features included a cafeteria, gymnasium, site improvements and outdoor recreation area.

  • Customer: Washoe County High School

  • Our Role: General Contractor

  • Size: 200,000 SF

  • Location: Reno, NV

Project Description

This project included the construction of a new 200,000 SF Comprehensive High School for the Washoe County School District featuring a gymnasium, auditorium, and athletics fields for baseball and football with a running track.