Archive

  • Customer: University Studies Abroad Consortium

  • Our Role: Design-Assist/CMAR

  • Size: 11,631 SF

  • Construction Schedule: 13 Months

  • Location: Reno, NV

Project Description

“The historic landscape surrounding the University of Nevada, Reno has a new landmark.”

 

Just across the street from Nightingale Concert Hall now stands a three-story office building with a distinctively modern aesthetic. The multifaceted design features a variety of unique and exotic finishes throughout, including more than 10 on the exterior alone. It is the new home of University Studies Abroad Consortium (USAC), an organization that spans 28 countries and specializes in providing university students with affordable and valuable study abroad programs.

 

As the Design-Build Contractor, United Construction collaborated extensively with USAC and the architect, Van Woert Bigotti, throughout design and preconstruction by providing constructability feedback and ideas for Value Engineering. The teamwork continued through construction and it is evident in the iconic stature of the final product.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 1.2 Million SF

  • Location: Reno, NV

Project Description

LogistiCenter at 395 Phase I is a 91-acre, three building, master-planned industrial park totaling 1.2 Million square-feet. As the Design-Build Contractor, United Construction, provided in-house design, and managed all construction related activity for the site, shell and tenant improvements. Tenants include Amazon.com, Lasco and Almo.

Tags:
  • Customer: LifeChurch

  • Our Role: Design-Assist/CMAR

  • Construction Schedule: 13 Months

  • Location: Reno, NV

Project Description

KidsLife is the first phase of a multi-phase development in South Reno. The 22,160 SF, two-story building features outdoor and indoor recreation areas, classrooms, and conference/multi-purpose space. As a CMAR, United Construction worked closely with LifeChurch and the architect during Pre-Construction and Construction to achieve their desired Programming within the confines of a strict budget.

  • Customer: Prologis

  • Our Role: General Contractor

  • Size: 240,500 SF

  • Construction Schedule: 7 Months

  • Location: Reno, NV

Project Description

This project included the construction of a new 240,500 square-foot, tilt-up speculative industrial facility for Prologis.

  • Customer: Avenue 55

  • Our Role: General Contractor

  • Size: 409,600 SF

  • Construction Schedule: 10 Months

  • Location: Sparks, NV

Project Description

This project included the construction for a new 409,600 square-foot, tilt-up speculative distribution facility with 32’ clear height. The building features six storefronts and double loaded dock doors. It is the second building of an industrial park development in Sparks, NV and United Construction was the General Contractor for both buildings.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 381,804 SF

  • Construction Schedule: 7 Months

  • Location: North Las Vegas, NV

Project Description

LogistiCenter at Cheyenne is a 381,804 square-foot, tilt-up facility that was designed and built to accommodate multiple tenants in the North Las Vegas industrial submarket. As the Design-Build Contractor, United Construction optimized the functionality of the building for distribution with 62 dock doors, 32’ clear height, 72 trailer stall and 277 car parking stalls.

  • Customer: STEP2

  • Our Role: Design-Build

  • Size: 12,000 SF

  • Construction Schedule: 7 Months

  • Location: Reno, NV

Project Description

This project included construction for a new 12,000 square-foot residential facility and a client resource center for women going through treatment to overcome substance abuse disorders. The 20-bed facility was designed as a nurturing healing residence that includes dorm rooms, a commercial kitchen and outdoor spaces that are conducive to a therapeutic environment. As the Design-Build Contractor, United Construction worked closely with the Architect to use innovative design and building methods to achieve a design that aligned with STEP2’s goals.

  • Customer: Renown Health

  • Our Role: General Contractor

  • Size: 1,395 SF

  • Construction Schedule: 2.5 Months

  • Location: Reno, NV

Project Description

This project included the construction of a Temporary Radiation Treatment Area for Renown Hospital. The new 1,395 square-foot, standalone building houses a radiation machine where oncology patients will be treated during the expansion of Renown’s existing facility. The Temporary Radiation Facility features a lobby with waiting room area, patient changing rooms, and a treatment room. As the General Contractor, United Construction Company was responsible for all of the site improvements including foundations, underground utilities, parking lot, sidewalks, landscaping, and site lighting.

  • Customer: Horizon Christian Church

  • Our Role: Design-Build

  • Size: 11,000 SF

  • Location: Sparks, NV

Project Description

This project included the design and construction of a new 11,000 square-foot church. The masonry building featured a sanctuary, second-story prayer room, classrooms and gathering spaces.

  • Customer: Prologis

  • Our Role: Design-Build

  • Size: 566,875 SF

  • Construction Schedule: 7 Months

  • Location: McCarran, NV

Project Description

Eagle Valley II is a 566,875 SF tilt-up, speculative distribution facility that features 36’ clear height ceilings. As the design-build contractor, United Construction provided in-house design services.