Archive

  • Customer: Atlantic Aviation

  • Our Role: Design-Build

  • Size: 43,000 SF

  • Construction Schedule: 10 Months

  • Location: Reno, NV

Project Description

This project included the design and construction of a new hangar and Fixed Base Operations (FBO) facility at the Reno Tahoe International Airport. The project included the demolition of two existing buildings on site, upgrading the existing site parking areas with new asphalt overlay, the installation and re-routing of existing utilities to the facility, and the construction of a new 30,000 square-foot aircraft hangar and new two-story 13,000 square-foot FBO facility.

  • Customer: Diamond Peak Ski Resort

  • Our Role: General Contractor

  • Size: 11,000 SF

  • Construction Schedule: 8 Months

  • Location: Incline Village, NV

Project Description

This project included the construction of a new 11,000 square-foot, wood and steel framed two-story building and related site improvements. The facility houses ski resort services including ticketing, sales, customer service, rentals, ski & snowboard skill development, mountain operations, locker rooms, conference space and administrative, marketing and management support office spaces.

  • Customer: Nevada Air National Gaurd

  • Our Role: Design-Build

  • Size: 36,150 SF

  • Construction Schedule: 14 Months

  • Location: Reno, NV

Project Description

This project included the demolition and removal of two existing buildings and construction of a two-story, 36,150 square-foot building with structural steel and masonry bearing walls, with Centria metal panels, glass window and curtain walls, and barrel and flat roof components. Includes offices, operational areas, meeting & assembly rooms, and locker rooms. The building is blast resistant in both the structural system and the exterior shell and skin system and includes a sophisticated communications and data system capable of transmitting visual, written, and voice information to military operations throughout the world. Intelligence gathering and transmitting operations within the building are shielded to prevent electronic penetration by outside sources.