  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 1.2 Million SF

  • Location: Reno, NV

Project Description

LogistiCenter at 395 Phase I is a 91-acre, three building, master-planned industrial park totaling 1.2 Million square-feet. As the Design-Build Contractor, United Construction, provided in-house design, and managed all construction related activity for the site, shell and tenant improvements. Tenants include Amazon.com, Lasco and Almo.

  • Customer: Prologis

  • Our Role: General Contractor

  • Size: 240,500 SF

  • Construction Schedule: 7 Months

  • Location: Reno, NV

Project Description

This project included the construction of a new 240,500 square-foot, tilt-up speculative industrial facility for Prologis.

  • Customer: Avenue 55

  • Our Role: General Contractor

  • Size: 409,600 SF

  • Construction Schedule: 10 Months

  • Location: Sparks, NV

Project Description

This project included the construction for a new 409,600 square-foot, tilt-up speculative distribution facility with 32’ clear height. The building features six storefronts and double loaded dock doors. It is the second building of an industrial park development in Sparks, NV and United Construction was the General Contractor for both buildings.

  • Customer: Dermody Properties

  • Our Role: Design-Build

  • Size: 381,804 SF

  • Construction Schedule: 7 Months

  • Location: North Las Vegas, NV

Project Description

LogistiCenter at Cheyenne is a 381,804 square-foot, tilt-up facility that was designed and built to accommodate multiple tenants in the North Las Vegas industrial submarket. As the Design-Build Contractor, United Construction optimized the functionality of the building for distribution with 62 dock doors, 32’ clear height, 72 trailer stall and 277 car parking stalls.

  • Customer: Prologis

  • Our Role: Design-Build

  • Size: 566,875 SF

  • Construction Schedule: 7 Months

  • Location: McCarran, NV

Project Description

Eagle Valley II is a 566,875 SF tilt-up, speculative distribution facility that features 36’ clear height ceilings. As the design-build contractor, United Construction provided in-house design services.

  • Customer: Lake Washington Partners

  • Our Role: General Contractor

  • Size: 621,738 SF

  • Construction Schedule: 8 Months

  • Location: Reno, NV

Project Description

This 621,738 square-foot distribution center features automated material handling equipment, 140,000 square-foot mezzanine, customer show room and 10,000 square-feet of office space with employee break room. The building serves as SanMar’s Western Region Distribution Center and was designed to maximize space for shipping/receiving, and parking.

  • Customer: Ardagh Metal Packaging USA

  • Our Role: Design-Build

  • Size: 331,000 SF

  • Construction Schedule: 5 Months

  • Location: McCarran, NV

Project Description

This project included the renovation of a 331,000 square-foot existing plastics extrusion facility into a manufacturing facility for the production of cans for food products. The work consisted of removing and deepening slab sections, adding footings for the manufacturing equipment, building a 30,000 square foot equipment mezzanine over the production areas, upgrading the electrical service, providing air conditioning to the facility, and bringing the facility to cGMP standards.

  • Customer: Amorim Cork

  • Our Role: Design-Assist/CMAR

  • Size: 48,000 SF

  • Construction Schedule: 6 Months

  • Location: Napa Valley, CA

Project Description

This concrete tilt-up project is a 48,000 square-foot facility housing natural cork storage, branding and light manufacturing. The facility includes a commercial grade laboratory, and features a 6,000 square-foot office build-out for management and administrative use.

  • Customer: NOW Foods

  • Our Role: Design-Build

  • Size: 187,000 SF

  • Construction Schedule: 7 Months (Phase 1), 6 Months (Phase 2)

  • Location: Sparks, NV

  • LEED Silver

Project Description

This project consisted of the design and construction for NOW Foods’ 187,000 square-foot facility, which features areas for manufacturing, warehousing, and distribution for nutraceutical products. The building is designed to cGMP Pharmaceutical Standards and is LEED Silver certified.

  • Customer: Urban Outfitters

  • Our Role: Design-Build

  • Size: 462,720 SF

  • Construction Schedule: 8 Months

  • Location: Reno, NV

Project Description

This facility has over 450,000 square-feet of internet order fulfillment space, 10,000 square-feet of office space, automated material handling systems, 3 level pick modules, a 24/7/365 data center and is LEED Silver Certified. The building design and color choices reflect Urban Outfitter’s unique Corporate Culture and Style.