Archive

  • Customer: NOW Foods

  • Our Role: Design-Build

  • Size: 187,000 SF

  • Construction Schedule: 7 Months (Phase 1), 6 Months (Phase 2)

  • Location: Sparks, NV

  • LEED Silver

Project Description

This project consisted of the design and construction for NOW Foods’ 187,000 square-foot facility, which features areas for manufacturing, warehousing, and distribution for nutraceutical products. The building is designed to cGMP Pharmaceutical Standards and is LEED Silver certified.

  • Customer: Urban Outfitters

  • Our Role: Design-Build

  • Size: 462,720 SF

  • Construction Schedule: 8 Months

  • Location: Reno, NV

Project Description

This facility has over 450,000 square-feet of internet order fulfillment space, 10,000 square-feet of office space, automated material handling systems, 3 level pick modules, a 24/7/365 data center and is LEED Silver Certified. The building design and color choices reflect Urban Outfitter’s unique Corporate Culture and Style.

  • Customer: WMS Gaming

  • Our Role: Design-Build

  • Size: 55,000 SF

  • Construction Schedule: 9 Months

  • Location: Reno, NV

Project Description

This project included the design and construction of a new 55,000 square-foot, two-story, class “A” LEED Gold office building.

  • Customer: United Construction

  • Our Role: Design-Build

  • Size: 12,250 SF

  • Construction Schedule: 8 Months

  • Location: Reno, NV

Project Description

The 12,250 square-foot, LEED Gold Certified office includes 2 interior courtyards, lighting control systems to reduce energy use, and recycled building materials purchased from local sources to minimize gas consumption. Each workstation features a window and roller shades allowing employees a view outside and control of their lighting.