10 Feb New 665,549 SF Industrial Park Nearing Completion in McCook, IL
Posted at 09:07h
in News
McCook, IL, February 10, 2015 – LogsitiCenter McCook is a state-of-the-art Industrial Park that features two buildings, and is located just 3 miles from the I-294 and I-55 interchange. As the Design-Builder, United Construction Midwest collaborated with the customer throughout property due diligence, design, and construction to create a flexible multi-tenant design, and maintain the nine month project schedule despite weather challenges.
Project Highlights
- 32′ clear height
- Flexible design can accommodate up to 6 tenants in each building
- Optimized accessibility with a shared truck court featuring 82 trailer stalls
- T5 lighting to 30 FC throughout
- Zoned heat and smoke controls