Fernley City Hall

  • Customer: City of Fernley

  • Our Role: Design-Build

  • Size: 35,000 SF

  • Construction Schedule: 10 Months

  • Location: McCarran, NV

Project Description

This design-build project included the design and expansion of the existing city hall to a total of 35,000 square-feet. The building was constructed of cast-in-place concrete for the basement walls, masonry and steel structural system for ground level floor and roof support, and a steel and wood structural system for the roof.