Ardagh Metal Packaging USA

  • Customer: Ardagh Metal Packaging USA

  • Our Role: Design-Build

  • Size: 331,000 SF

  • Construction Schedule: 5 Months

  • Location: McCarran, NV

Project Description

This project included the renovation of a 331,000 square-foot existing plastics extrusion facility into a manufacturing facility for the production of cans for food products. The work consisted of removing and deepening slab sections, adding footings for the manufacturing equipment, building a 30,000 square foot equipment mezzanine over the production areas, upgrading the electrical service, providing air conditioning to the facility, and bringing the facility to cGMP standards.